Considerations To Know About ATS Socomec

ATyS C35 assures the automatic or distant transfer in open changeover from one particular source to a different with programmable thresholds and timers.

Pleasant Grid, storage for integrating renewable Vitality and islanding Paradise, a wise community for your area people Solenbat optimises the Lively energy effectiveness of structures Stem, Electrical power storage techniques for minimized electricity billing Innovation Close

EN Resource library has all the things you would like that may help you decide on the top electrical power solution.

ATyS t and g switches supply significant time conserving all through commissioning (method usually takes 2 to 3 minutes). Owing to the look that allows commissioning by just two potentiometers (four within the ATyS g) and 4 DIP switches, a scrrewdriver is everything is required to configure the parameters.

ช่วยให้คุณสะดวกสบาย ไม่ต้องคอยเปิด-ปิดเครื่องใช้ไฟฟ้าด้วยตัวคุณเอง วิธีใช้งาน คำแนะนำ ข้อควรระวัง คุณสมบัติ

รับสมัครช่างวายริ่งตู้คอนโทรล,ช่างไฟฟ้า,ช่างประกอบตู้คอนโทรล รับทำตู้ไฟชั่วคราว ตู้ไฟสนาม ตู้มิเตอร์

รับประกอบตู้ไฟฟ้า – ตู้ควบคุมทุกชนิด

This controller also displays the knowledge that it collects within the network and switch the two on display screen in addition to over the LED synoptic, enabling consumers to keep an eye on the set up status.

EN Resource library has anything you need to assist you pick out the best electrical power Resolution.

ข้อมูลไฟฟ้าน่ารู้, อุปกรณ์ไฟฟ้าอื่นๆ, เครื่องมือช่าง

The ATyS C66 is an ATSE controller go here intended to control all sorts of crisis methods, lawfully required and optional standby transfer switching products According to NEC (NFPA 70).

Versatile Room saving The ATyS C25 controller is usually mounted on both a DIN rail or for the panel door, featuring overall flexibility and optimising Area.

Quickly commissioning On Original electrical power up, the ATyS C65’s good wizard will guidebook the operator in the commissioning procedure.

EN Useful resource library has anything you require that may help you pick out the top electrical power Answer.

The ATyS t’s built-in controller has long been made to present just the functions necessary for these software (Procedure with or without priority, desired supply range) together with the monitoring in the voltage and frequency of both equally resource, for 3-section and single-stage networks.

Leave a Reply

Your email address will not be published. Required fields are marked *